Bid documents
Members download plans, specs and addenda here. Join for $400/yr or log in.

Scope of work
Federally funded street rehab on Cole Boulevard: mill existing asphalt, place a leveling course, then rubberized asphalt membrane (ARAM) and rubberized hot mix (ARHM) surface; ADA corner ramps, survey, utility adjustments and traffic control. 90 calendar days. Sealed paper bids go to the City Clerk at 608 Heber Ave.
Plan holders (0)
0 companies have listed themselves as bidding. Members see who and how to reach them.